False Ceiling Installation Process
Firstly, all required measurements of ceiling (length and width) and ceiling to wall (for height of false ceiling) are taken for each room where false ceiling is to be installed. material requirement is calculated depending on size, area of rooms/ place where it needs to be installed. The ceiling levelling is done with water or laser levelling because most of the times the slabs are not levelled. After levelling procedure is complete, marking is done.
These fittings become the Major support points for false ceiling. Once the Ceiling Angles are hanged then the Perimeter Channels need to be fitted on the walls / partitions at a height where false ceiling will be suspended. Then the Intermediate Channel needs to be fixed with the hanged Ceiling Angles according to the level at the distance of 1220mm Ceiling Sections are then fitted to the main foundation forming the precise framework that enables attaching plaster board or any other material used for false ceiling. Ceiling Sections need to be fitted below the Intermediate Channel with DF Connecting Clip at the distance of 457mm center to center that enables suspending the plaster board or any other materials used for False Ceiling.